| Num |
Title |
Revised |
| 101 |
Disabled Parking |
07/10/2007 |
| 102 |
Standard Parking |
03/28/2003 |
| 103 |
Angled Parking |
03/28/2003 |
| 104 |
Temporary Curb Mounting |
03/28/2003 |
| 105 |
Temporary Curb Cut |
03/28/2003 |
| 106 |
Typical Curbing |
08/20/2010 |
| 106a |
Standard Intersection Header Curb Detail |
04/30/2008 |
| 107 |
Non-Typical Curbing |
03/28/2003 |
| 108a |
Residential Driveways |
08/20/2010 |
| 108b |
Residential Driveways |
11/15/2010 |
| 108c |
Residential Driveways |
11/15/2010 |
| 108d |
Residential Driveways - Paver Bricks in Right-of-Way |
08/20/2010 |
| 108e |
Commercial Driveways |
11/15/2010 |
| 109a |
Concrete Sidewalk |
09/22/2010 |
| 109b |
ADA Sidewalk Ramp |
09/22/2010 |
| 109c |
Thickened Edge Sidwwalk |
09/22/2010 |
| 109d |
Raised Sidewalk with 'D' Curb |
09/22/2010 |
| 110 |
Pavement Edge Flush Header Curb |
02/05/2007 |
| 111 |
Intersection Striping |
03/28/2003 |
| 112a |
Asphalt Overlay - Transition to Existing Asphalt |
04/02/2007 |
| 112b |
Pavement Widening - Tie-in Existing Pavement |
04/02/2007 |
| 112c |
Pavement Widening - with Asphalt Milling & Overlay |
04/02/2007 |
| 112d |
Pavement Widening for Extended Shoulders |
06/14/2007 |
| 113 |
Minimum Pavement Structural Numbers |
03/28/2004 |
| 114 |
Utility Trench Shoulder Restoration |
03/28/2003 |
| 114a |
Swale Restoration |
08/20/2010 |
| 115 |
Intersection Clear Sight Line |
03/28/2003 |
| 116 |
Concrete Paver System for Roadways |
07/03/2008 |
| 117 |
Paver Pedestrian Crossing & Special Header Curb |
07/03/2008 |
| 118 |
Concrete Paver System for Roadway Median Area |
07/03/2008 |
| 119 |
Pavement Restoration |
03/28/2003 |
| 120 |
Asphalt Pathway |
05/12/2007 |
| 121 |
Pavement Repair |
10/02/2007 |
| 122 |
Roadway Cross-Sections for Shoulder & Swale Development |
02/07/2007 |
| 123 |
Collector Roadway Shoulder Restoration |
02/02/2007 |
| 124a |
Concrete Open Flume |
04/02/2007 |
| 124b |
Concrete Closed Flume |
07/03/2008 |
| 125 |
Turf Block |
06/21/2007 |
| 126 |
Collector Roadway Safety Edge |
08/20/2010 |
| 301a |
Asphalt Speed Hump |
08/20/2010 |
| 301b |
Concrete Speed Hump |
08/20/2010 |
| 302a |
Asphalt Speed Table |
08/20/2010 |
| 302b |
Concrete Speed Table |
08/20/2010 |
| 303 |
Pinch Point |
08/20/2010 |
| 401 |
Electrical Conduit Installation Plan |
07/02/2008 |
| 402 |
Junction Box & Stup Up Installation Plan |
07/02/2008 |